Engine Back in the Frame Rails

 

With most of the motor back together I wanted to get the engine back in the frame so I could get the headers hung so that I can get some welding done on the 90 degree turn backs and flange adapters before having the headers coated

While the headers are out for ceramic coating I can get the radiator hooked up, the cooler lines for the transmission in, top off all of the fluids, install the distributor, plugs and wiring and a temporary fuel tank.

IMG_20200710_110202

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s